• Size 57,000 Sq. Ft. | Three-story Student Center renovation
    • Type of Project Education
    • Client Marywood University

Marywood University | Nazareth Hall Renovation

Scope of work

Nazareth Hall is the social hub of the University. The facility houses the campus’ Main Dining Room, a café-style eatery, two student lounges, two large meeting spaces, a game room, and the Student Center.

Renovation of this facility presented a huge challenge for the entire construction team. Work could not begin until the end of the semester, and there was only a 10-week window to completely finish the job before classes restarted in the fall.

As part of the construction team, we took the schedule very seriously. The impact of this project not being ready for the upcoming school year would have affected student activities and living on the University campus.

I had the pleasure of working with the Urban Electric team during the renovation of Nazareth Hall at Marywood University. This was a challenging project that had to be completed in a very tight timeframe. Urban performed flawlessly. They provided additional manpower when required, kept up with all deadlines, stayed within budget and performed with utmost professionalism. They are excellent. I would recommend them for any project.

 

JOHN BONACCI
SENIOR PROJECT MANAGER
REUTHER + BOWEN

Completing on schedule was our focus from day one. The project had multiple trades, design teams, facility staff, and Construction Managers all working in concert in a very small timeframe to complete on schedule.

Project info
Client
Marywood University
Category
Education
Size
57,000 Sq. Ft. | Three-story Student Center renovation